久久久久久久亚洲精品|亚洲欧美国产精品一区|四十路の五十路熟女豊満|日日摸夜添夜夜夜添高潮|自拍偷拍亚洲精品无码视频|91久久精品日日躁夜夜躁|蜜芽亚洲AV无码精品色无码|亚洲日韩精品一区二区三区无码

NEWS


Current location:Home> News> Industry News

Operation steps of coating machine
Release time:2021-04-07 10:55:43      Click times:159

1. Turn on the cooling water switch, the air compressor switch (the red button of the air compressor is pulled up to open, and pressed down to close) and the main power switch of the coating machine.

2. Place the glass substrate in the sample holder, with the conductive side facing down, and the side of the etched tape close to the blue line of the sample holder.

3. Vent the pretreatment chamber. After the air is released, tighten the vent valve, open the pretreatment chamber door, place the sample holder on the push-pull rod, and close the door.

4. Turn on the mechanical A, mechanical B pumps and four vacuum gauges.

5. Substrate pretreatment: open the angle valve. When the vacuum degree of the pretreatment chamber reaches 2.0E1 ~ 5.0E1 (2.0×10~5.0×10)Pa, close the angle valve and open the angle valve of the vacuum evaporation chamber. Turn on the DC sputtering power supply, then press the start button, adjust the current 0.020-0.025*, bombard for 10 minutes, adjust the current to 0A, press the stop button, and turn off the power.

6. Open pump A and angle valve, and when the degree reaches below 4.0E0, that is, when the vacuum pressure on both sides is basically the same (about ten minutes), close the angle valve, valve A, and open the space between the evaporation chamber and the pretreatment chamber. Check the baffle under the rotating table, and make sure that the baffle is placed in the proper position. The sample is transferred to the evaporation chamber, and the sample holder is grasped by the manipulator and held on the manipulator; then the push-pull rod is pulled back to the pretreatment, and the gate valve is closed; the evaporation table is lowered to be flush with the manipulator, and the sample holder is gently Push into the sample holder guide groove (upper guide groove) under the evaporation table.

 7. When the vacuum degree of the evaporation chamber reaches 1.2E1 (1.2×10) Pa or less, close the angle valve and the mechanical A pump. Open the gate valve and evacuate the evaporation chamber to 7.0E-4Pa (about 2 hours).


News you are interested in
Previous:NO!
Next:What are the three major categories of glass?

Back to list

COPYRIGHT ? 2021 ALL RIGHTS RESERVED copyright:Jiangsu verman Machinery Equipment Co., Ltd
胶州市| 黔江区| 五指山市| 巴东县| 姜堰市| 喀喇沁旗| 大城县| 婺源县| 凤庆县| 沙坪坝区| 大埔县| 天台县| 繁昌县| 荃湾区| 灵武市| 甘孜| 哈尔滨市| 平凉市| 静乐县| 元朗区| 南漳县| 雅江县| 准格尔旗| 且末县| 通海县| 安义县| 隆尧县| 平潭县| 会同县| 新昌县| 钦州市| 胶南市| 民和| 灵寿县| 康平县| 中西区| 奈曼旗| 大关县| 赣州市| 乾安县| 会理县|